Corporate
Client: General DynamicsArchitect: Lehman Smith Mcleish

Falls Church, VA | 160,000 sf

General Dynamics has been a client since 1997. Projects include the renovation/re-fit of their existing headquarters and its relocation. Work at the new facility included work on five floors with focus on stair, conference facilities, office space, cafe, and auditorium. The project involved two stair installations. The “grand staircase” on the 11th-15th floors allowes access to the conferencing center and auditorium while the smaller stair guides visitors between events and the cafeteria/dining areas on the 10th and 11th floors.  The 10th floor was dedicated to conferencing and large gatherings and was designed to be interactive and multi-functional with advanced AV and teleconferencing capabilities. Typcial offices were located on the exterior perimeter of floors 11-15 with executive corner offices. Finishes include custom millwork doors, glass fronts, and specialty lighting systems. For A full-service kitchen with walk-in coolers/freezer, commercial prep and grill area, and soup/salad bar allows for in-house catering and food services. A tiered platform with seating for 95 spans two floors. Detailed coordination was required for electrical, lighting, AV, cooling/fire protection to be hidden behind architectural millwork and soft finishes.

asterisk inspire. advise. build. sustain.