TD Bank contracted rand to build a new branch in Alexandria at an existing abandoned gas station. The project required demolition of the existing structure and underground infrastructure and level […]
TD Bank
Internet Explorer is not officially supported, please try these modern browsers:
TD Bank contracted rand to build a new branch in Alexandria at an existing abandoned gas station. The project required demolition of the existing structure and underground infrastructure and level […]
Three Crowns is an international arbitration firm who contracted rand to perform preconstruction and construction services for their new DC Office located in Washington Harbour. The design called for a […]
rand* construction stepped in as the general contractor on the Paul Stuart project at CityCenter after a previous contractor was removed from the job. Although the work was over half […]
UPenn contracted rand* to provide construction services for the new tenant interior project for the Penn Biden Center for Diplomacy and Global Engagement. The project required a complete demolition of […]
rand* was contracted to provide preconstruction and construction services for PN Hoffman’s new 22,000-sf headquarters in the heart of their 3 million square-foot Wharf redevelopment project. rand* participated in dedicated […]
Washington Gas (WGL) had a need to relocate their headquarters to the newly developed District Wharf. The move required extensive coordination and communication due to the aggressive schedule and delivery […]
Rappaport had a need to renovate their existing headquarters on the 7th and 8th floors. The project was planned to be a phased-in-place occupied approach. rand* was contracted to participate […]
The Washington Post project was not only groundbreaking, but subject to much media attention both regionally and nationally. The culmination of significant efforts behind the development represents an evocative shift […]
March of Dimes had a need to relocate their corporate headquarters from White Plains, NY to Arlington, VA. The new space on the 13th floor of the Square 2 building […]
The McCarter English project was a relocation of a high-end tenant interior build-out which required extensive coordination in preconstruction. The primary goal of the preconstruction effort was to maintain the […]