Internet Explorer is not officially supported, please try these modern browsers:

Stantec Design Studio – Arlington

Stantec is an international architecture and interior design who had a need to construct a satellite office in the Arlington market. rand* was contracted to provide preconstruction and construction services […]

Read More…

Summit Foundation

The unique challenge to this project was its construction requirements through the Living Build Challenge (LBC), which is an international sustainable building certification program that is more rigorous than most […]

Read More…

TD Bank

TD Bank contracted rand to build a new branch in Alexandria at an existing abandoned gas station. The project required demolition of the existing structure and underground infrastructure and level […]

Read More…

Three Crowns, LLP

Three Crowns is an international arbitration firm who contracted rand to perform preconstruction and construction services for their new DC Office located in Washington Harbour. The design called for a […]

Read More…

Paul Stuart

rand* construction stepped in as the general contractor on the Paul Stuart project at CityCenter after a previous contractor was removed from the job. Although the work was over half […]

Read More…

UPenn Biden Center

UPenn contracted rand* to provide construction services for the new tenant interior project for the Penn Biden Center for Diplomacy and Global Engagement. The project required a complete demolition of […]

Read More…

PN Hoffman

rand* was contracted to provide preconstruction and construction services for PN Hoffman’s new 22,000-sf headquarters in the heart of their 3 million square-foot Wharf redevelopment project. rand* participated in dedicated […]

Read More…

Washington Gas HQ – The Wharf

Washington Gas (WGL) had a need to relocate their headquarters to the newly developed District Wharf. The move required extensive coordination and communication due to the aggressive schedule and delivery […]

Read More…

Rappaport

Rappaport had a need to renovate their existing headquarters on the 7th and 8th floors. The project was planned to be a phased-in-place occupied approach. rand* was contracted to participate […]

Read More…