Davis Wright Tremaine is a business and litigation law firm who contracted rand* to perform preconstruction and construction services for their new DC Office located in the second generation class-A […]
Region: Midatlantic
Avalon Bay
The new headquarters space acts as an anchor tenant in the first-generation space while targeting LEED Gold Certification. The scope of work included an interconnecting stair between the four floors […]
Washingtonian Magazine
Washingtonian was a 11,715 square foot Class-A project, delivered in an old building, which provided unique challenges for the fast paced-project. The tenant space, designed by Form Architects, provides the […]
25 Massachusetts Ave
This CapEx project at 25 Massachusetts Ave, in downtown DC, renovated the lobby, adjacent amenity space, and terrace courtyard with open space and modern luxury in mind. It required an […]
National Federation of Independent Business
The National Federation of Independent Business contracted rand* to deliver their new 21,435 square-foot office space in the heart of DC. The high-end space was built from a shell condition […]
Willkie Farr & Gallagher LLP
rand* completed this three-phased renovation over six floors for the law firm Willkie Farr & Gallagher’s existing office space. This project was a renovation to the office space rand* built-out […]
Wilson Elser – DC
The tenant improvement project for Wilson Elser was a jewel box space housing a complex design in a small footprint. The scope called for selective demolition and full construction of […]
WTOP
The scope for WTOP includes a complete demo and build-back of the fifth floor and partial construction of the roof, Level P-3 of the garage, and Level 8 core space. […]
Washington Gas HQ – The Wharf
Washington Gas (WGL) had a need to relocate their headquarters to the newly developed District Wharf. The move required extensive coordination and communication due to the aggressive schedule and delivery […]
Rappaport
Rappaport had a need to renovate their existing headquarters on the 7th and 8th floors. The project was planned to be a phased-in-place occupied approach. rand* was contracted to participate […]