The tenant improvement project for Wilson Elser was a jewel box space housing a complex design in a small footprint. The scope called for selective demolition and full construction of […]
Wilson Elser – DC

Internet Explorer is not officially supported, please try these modern browsers:
The tenant improvement project for Wilson Elser was a jewel box space housing a complex design in a small footprint. The scope called for selective demolition and full construction of […]
The scope for WTOP includes a complete demo and build-back of the fifth floor and partial construction of the roof, Level P-3 of the garage, and Level 8 core space. […]
The unique challenge to this project was its construction requirements through the Living Build Challenge (LBC), which is an international sustainable building certification program that is more rigorous than most […]
TD Bank contracted rand to build a new branch in Alexandria at an existing abandoned gas station. The project required demolition of the existing structure and underground infrastructure and level […]
Three Crowns is an international arbitration firm who contracted rand to perform preconstruction and construction services for their new DC Office located in Washington Harbour. The design called for a […]
rand* construction stepped in as the general contractor on the Paul Stuart project at CityCenter after a previous contractor was removed from the job. Although the work was over half […]
UPenn contracted rand* to provide construction services for the new tenant interior project for the Penn Biden Center for Diplomacy and Global Engagement. The project required a complete demolition of […]
rand* was contracted to provide preconstruction and construction services for PN Hoffman’s new 22,000-sf headquarters in the heart of their 3 million square-foot Wharf redevelopment project. rand* participated in dedicated […]
Washington Gas (WGL) had a need to relocate their headquarters to the newly developed District Wharf. The move required extensive coordination and communication due to the aggressive schedule and delivery […]
Rappaport had a need to renovate their existing headquarters on the 7th and 8th floors. The project was planned to be a phased-in-place occupied approach. rand* was contracted to participate […]