Internet Explorer is not officially supported, please try these modern browsers:

Willkie Farr & Gallagher LLP

rand* completed this three-phased renovation over six floors for the law firm Willkie Farr & Gallagher’s existing office space. This project was a renovation to the office space rand* built-out […]

Read More…

Wilson Elser – DC

The tenant improvement project for Wilson Elser was a jewel box space housing a complex design in a small footprint. The scope called for selective demolition and full construction of […]

Read More…

WTOP

The scope for WTOP includes a complete demo and build-back of the fifth floor and partial construction of the roof, Level P-3 of the garage, and Level 8 core space. […]

Read More…

Stantec Design Studio – Arlington

Stantec is an international architecture and interior design who had a need to construct a satellite office in the Arlington market. rand* was contracted to provide preconstruction and construction services […]

Read More…

Summit Foundation

The unique challenge to this project was its construction requirements through the Living Build Challenge (LBC), which is an international sustainable building certification program that is more rigorous than most […]

Read More…

TD Bank

TD Bank contracted rand to build a new branch in Alexandria at an existing abandoned gas station. The project required demolition of the existing structure and underground infrastructure and level […]

Read More…

Three Crowns, LLP

Three Crowns is an international arbitration firm who contracted rand to perform preconstruction and construction services for their new DC Office located in Washington Harbour. The design called for a […]

Read More…

Paul Stuart

rand* construction stepped in as the general contractor on the Paul Stuart project at CityCenter after a previous contractor was removed from the job. Although the work was over half […]

Read More…

UPenn Biden Center

UPenn contracted rand* to provide construction services for the new tenant interior project for the Penn Biden Center for Diplomacy and Global Engagement. The project required a complete demolition of […]

Read More…

PN Hoffman

rand* was contracted to provide preconstruction and construction services for PN Hoffman’s new 22,000-sf headquarters in the heart of their 3 million square-foot Wharf redevelopment project. rand* participated in dedicated […]

Read More…